A SELECTION OF COMPLETED PROJECTS.

New connection for B462: Road bridge with DiZWO system caps (Schramberg 2010)
Coordinates: 48°14’08.6“N / 8°22’25.7“E

Repair of the Bärenbrücke with DiZWO system caps with integrated plate anchors (Simonswald 2010)
Coordinates: 48°05’30.6“N / 8°02’45.3“E

Renovation of stream culvert with DIZWO system caps at the Auto- und Uhrenmuseum [Car & Watch Museum] (Schramberg 2010)
Coordinates: 48°13’42.9“N / 8°23’44.1“E

Renovation of stream culvert with DIZWO system caps at the Auto- und Uhrenmuseum [Car & Watch Museum] (Schramberg 2010)
Coordinates: 48°13’42.9“N / 8°23’44.1“E

Renovation of bypass over the Schwangenbach with DiZWO system caps (winches in Elztal 2010)

Repair of bridge over the Teichbach with DIZWO system caps (Gütenbach 2009)
Coordinates: 48°03’03.2“N / 8°07’07.4“E

Renovation of the Kaibachbach bridge with DiZwo system caps (Schiltach 2009)
Coordinates: 48°17’36.4“N / 8°20’48.1“E

Repair to Bittelbronner bridge ramp with DiZWO system caps (Horb-Diessen 2009)

Repair to Bittelbronner bridge ramp with DiZWO system caps (Horb-Diessen 2009)

New build of Göttelbachbach bridge with DiZWO system caps (Schramberg 2008)

New build of Bühlhof bridge with pavement reinforcement (‘Raubacher shoulder’) on just one side for long-term comparative measurements (Schramberg 2008)

Damage incident and installation of the ‘Raubacher shoulder’ on the Hammerbach bridge (Vöhrenbach-Hammereisenbach 2006)

Balcony extension accessible for the movement-impaired, and wheelchair elevator (Aichhalden 2009)

Roofing of truck weighbridge at Tuningen garbage tip (2008)

SIE HABEN EIN PROJEKT?

KONTAKTIEREN SIE UNS